Skip to content
kchakhabarehकेछखबर
StoryEN onlyfirst: 6d agolast: 5d ago

पहिरोका कारण बन्द भएको बेनी–दरबाङ सडक एक हप्तापछि खुल्यो

म्याग्दीको बेनी–दरबाङ सडक खण्डमा एक हप्तापछि सवारी आवागमन सुचारु भएको छ। बेनी नगरपालिका–४ र मंगला गाउँपालिका–२ को सीमाना फापरखेतमा सुक्खा पहिरो जाँदा सडक अवरुद्ध भएको थियो। म्याग्दीको पूर्वाधार विकास कार्यालयले पहिरोको मलबा हटाएर सडक हाललाई खोलेको छ। मंगला कन्स्ट्रक्सनका प्रतिनिधि राजु पाण्डेका अनुसार सडक हाललाई खुला गरिएको हो।

TopicsMyagdi
3 publishers · 3 headlines · developing over 13 hours
Broke firstNepal News (English) logoNepal News (English)

Beni-Darbang road reopens after one week closure

KATHMANDU: The Beni-Darbang road, which serves as a vital link connecting three rural municipalities in western Myagdi to the district headquarters, has resumed operations after a week-long closure. The road was blocked on Oct. 31 due to a dry landslide at Phaparkhet, located on the border of Beni Municipality-4 and Mangala Rural Municipality-2. The Infrastructure […]

nation3 publishers
Coverage

2 more headlines since

first · 6d agolatest · 5d ago
  1. Vehicular movement resumes on Beni–Darbang road

    MYAGDI: Vehicular movement along the Beni–Darbang road, which connects three local levels in western Myagdi with Beni Bazaar, has resumed after a week-long disruption. The road had been blocked by dry landslides at Phaparkhet, along the border of Beni Municipality-4 and Mangala Rural Municipality-2, since October 18. The Infrastructure Development Office in Myagdi temporarily reopened […]

  2. Vehicular movement on Beni-Darbang road resumes after a week

    Vehicular movement on Beni-Darbang road connecting three local levels of western belt of Myagdi with Beni bazaar has resumed from today. The road was obstructed after dry landslides started taking place at Phaparkhet, the bordering of Beni municipality-4 and Mangala Rural Municipality-2, from October 18. The Infrastructure Development Office, Myagdi, opened the road for the time being, removing the landslide debris. A representative of Mangala Construction, Raju Pandey, shar

Where to next

Keep reading

Three different directions, drawn from today’s coverage — more on this story, a thread you may have missed, and one quietly gaining steam.