Skip to content
kchakhabarehकेछखबर
StoryEN onlyHotfirst: 8h agolast: 3h ago

त्रिशूली करिडोरका बाढीले क्षति पुगेका १८ झोलुङ्गे पुल सञ्चालनमा

भोटेकोशी–त्रिशूली नदीको बाढीले क्षति पुगेका त्रिशूली करिडोरका १८ झोलुङ्गे पुल मर्मतपछि सञ्चालनमा आएका छन्। स्थानीय पूर्वाधार विकास विभागअन्तर्गतको झोलुङ्गे पुल डिभिजन कार्यालयका अनुसार बाढीका कारण ती पुलमा क्षति पुगेको थियो। कार्यालयका योजना प्रमुख सचिव शंकर बुढाथोकीका अनुसार सबै पुल मर्मत भई सञ्चालनमा आइसकेका छन् र यसका लागि करिब ५ करोड ५० लाख रुपैयाँ खर्च भएको छ।

3 publishers · 3 headlines · 3 in 24h · developing over 4 hours
Broke firstmyRepublica logomyRepublica

18 flood-damaged suspension bridges resume operation after repairs

According to the Suspension Bridge Division Office under the Department of Local Infrastructure Development, 18 suspension bridges along the Trishuli corridor were damaged by the floods.

news3 publishers
Coverage

2 more headlines since

first · 8h agolatest · 3h ago
  1. 18 flood-damaged suspension bridges brought back into operation after repairs

    Kathmandu, October 16 Eighteen suspension bridges damaged by flooding in the Bhotekoshi-Trishuli river corridor have been repaired and brought back into operation. According to the Suspension Bridge Division Office under the Department of Local Infrastructure Development, 18 suspension bridges along the Trishuli corridor were damaged by the floods. Shanker Budhathoki, planning chief at the office, […] The post 18 flood-damaged suspension bridges brought back into operation after repairs appeared first on OnlineKhabar English News.

  2. Flood-damaged 18 suspension bridges come into operation after maintenance

    Eighteen suspension bridges that were damaged by the Bhotekoshi-Trishuli River flooding have been brought into operation after maintenance. According to the Suspension Bridge Division Office under the Department of Local Infrastructure Development, 18 suspension bridges on the Trishuli corridor were damaged due to flooding. Planning Chief Secretary at the Office, Shanker Budhathoki, informed that all the bridges have been repaired and are operational. He shared that around Rs 55 m

Where to next

Keep reading

Three different directions, drawn from today’s coverage — more on this story, a thread you may have missed, and one quietly gaining steam.