Skip to content
kchakhabarehकेछखबर
StoryEN onlyHotfirst: 3h agolast: 2h ago

बेत्रावतीमा बेली पुल बनेपछि रसुवाको सडक सम्पर्क पुनःस्थापित

बेत्रावतीमा बेली पुल निर्माण भएपछि ४७ दिनपछि रसुवा जिल्लाको सडक सम्पर्क पुनःस्थापित भएको छ। नेपाली सेनाले पूर्वनिर्मित ट्रस पुल जडान गरेपछि नुवाकोटदेखि रसुवासम्मको सडक सम्पर्क जोडिएको हो। अगस्ट २६ मा भोटेकोशी र त्रिशूली नदीमा आएको बाढीले विदुर नगरपालिका–१० र उत्तरगया गाउँपालिकालगायतका मोटर चल्ने पुल बगाएपछि सडक सम्पर्क अवरुद्ध भएको थियो। फलाखु खोलामा पुल बनेपछि सवारी आवागमन सुरु भई यातायात सहज भएको छ।

4 publishers · 4 headlines · 4 in 24h · developing over 1 hour
Broke firstOnlineKhabar (English) logoOnlineKhabar (English)

Rasuwa’s road link restored after 47 days as Bailey bridge opens in Betrawati

Kathmandu, October 11 Road connectivity with Rasuwa has been restored after 47 days, following the construction of a Bailey bridge over the Phalakhu Khola in Betrawati, where floods on August 26 washed away both the old and new motorable bridges. Traffic resumed after a modular Acrow bridge, commonly known as a Bailey bridge, was installed […] The post Rasuwa’s road link restored after 47 days as Bailey bridge opens in Betrawati appeared first on OnlineKhabar English News.

Coverage

3 more headlines since

first · 3h agolatest · 2h ago
  1. Bailey bridge at Betrawati restores road connectivity with Rasuwa

    The road connectivity with Rasuwa district, which was disrupted since August 26 Bhotekoshi flood, has been restored with the installation of a bailey bridge on Sunday.The pre-fabricated truss bridge was fixed by the Nepal Army at Betrawati. It has established the road connection from Nuwakot to Rasuwa, thereby easing transportation activities. The devastating flood in Bhotekoshi-Trishuli rivers had washed away two motorable bridges- at Bidur Municipality-10) and at Uttargaya Rural Municipal

  2. Bailey bridge at Betrawati restores road connectivity with Rasuwa

    Trishuli (Nuwakot), Oct 11: The road connectivity with Rasuwa district, which was disrupted since August 26 Bhotekoshi f...

  3. Vehicle movement resumes in Rasuwa after modular bridge opens

    The new bridge at Betrawati provides an alternative to the bridge swept away by the flood, which had completely severed road access to the affected area of Rasuwa after the bridge over the Phalakhukhola was destroyed.

    myRepublica logomyRepublicaPrivatenews4 publishers
Where to next

Keep reading

Three different directions, drawn from today’s coverage — more on this story, a thread you may have missed, and one quietly gaining steam.